The ws900e is an industry standard depth of 14.
Amana wall sleeve installation.
Insulated stonewood beige metal wall sleeve.
Do not distort the cabinet shape to fit the wall opening.
The sleeves are required for new installations of 26 in.
They are usually only set in response to actions made by you which amount to a request for services such as setting your privacy preferences logging in or filling in forms.
Remove the outside enclosure panel from the wall sleeve.
Plug in receptacle and field wiring access speed installation.
Location size and clearances install the wall sleeve as follows.
H x 42 1 4 in.
Slide the wall sleeve into the wall opening.
Sleeves may be shipped separately to allow for installation during construction.
W x 16 1 16 in.
The amana commercial microwaves are manufactured under license by acp inc.
Can be installed in the unit sub base.
The amana ptac systems are manufactured under license by goodman global inc.
Sub base may be installed onto wall sleeve either before or after sleeve installation minimum clearance between wall sleeve bottom and finished floor is 3.
Sleeve is required for new installations.
Electrical accessories meet nec requirements.
D x 42 in.
Location size and clearances install the wall sleeve as follows.
Required for new installations.
Locate the sleeve within the range of minimum projec.
The extra deep sleeves can be custom ordered starting at 16 to 24 in 1 increments as well as from 28 to 36.
See frame figure 1 for wall sleeve dimensions and figure 3 for minimum wall opening size.
An accessory metal front panel pbwmfc is after the wall opening is checked and approved for strength also available but must be purchased separately.
Page 4 wall sleeve installation after the wall opening is checked and approved for loca alternative tion size and clearances complete the following to install fastening method field supplied the.
Slide the wall sleeve into the wall opening.
Do not distort the cabinet shape to fit the wall opening.
H industry accepted.
Wood the wall opening must be the correct size.
Amana wall sleeve is a solid sided insulated metal sleeve.
Maximum height clearance from bottom of wall sleeve and finished floor is 5.
Weatherboard for use during construction is included.
Wall sleeve installation after the wall opening is checked and approved for location size and clearances complete the following to install the wall sleeve.
Page 3 waterproof barrier should remain in place until the unit is wall sleeve installation installed.
Remove the outside enclosure panel from the wall sleeve.
The unit chassis must fit snugly and uniformly into the wall sleeve.
Through the wall air conditioners air conditioners with heat and heat pump units.